Home / Resiliency / 

We stand for failure safety

Because of the present-day climate change extreme weather conditions are becoming more frequent.

In recent years damaged lattice structures have become a risk factor for energy supply and business operation.

  • In any case:  based on our experience and our technical product range we supply steel for all types of damage – partial damage or entire mast deliveries are no problem for our contractors in an emergency.
  • In combination with our high-performance machinery at FICEP standard we master all operations – in case of imminent urgency even in parallel – so that the required steel is available for assembly as quickly as possible. To cope with peaks, our company is ready to employ leased personnel. A comprehensive stock of materials adapted to the specialized field of pylon and substation construction enables work to start immediately. If required, a continuous thread connects structural design, construction and production to a complete service range from one single source.
  • Short routes: due to our location in Austria we are always near you and can be reached at all times. With regard to galvanizing, coating and transport we have been counting on our reliable contractors for decades; they process our orders at short notice.

As the last company in Austria specializing in pylon construction in a comprehensive manner we stand for failure prevention.

For our customers – at all times.

Top